11 · Adoption¶
← 10 Personas — expert lenses · Contents · Next: 12 The .add/ bundle — ABF-1 format →
A 90-day rollout¶
Adopt the method on one real product, not as an all-at-once mandate.
- Days 1–15 — Lay the foundation. Install the skill on one pilot service. Let the agent write
.add/PROJECT.mdfrom the existing code — goal,invariants:, the test command — and seed the five specs. Read what it wrote and correct it; the invariants you keep bind every change from then on. - Days 16–45 — One task, end to end. Run a single real feature through the loop and read everything it leaves: the task file, the
freezecommit, the evidence, the report. Most of the learning is in the assumptions it took. - Days 46–75 — Trust the evidence. Re-run the commands in a task's
## EVIDENCEyourself at the recorded commit. Plant a defect a check should catch and confirm it goes red. Make a security finding and confirm it reaches the top of the report as aHARD-STOP. - Days 76–90 — Widen. Let the agent size freely across Quick, Task, Explore and Milestone; run a first set of independent tasks in parallel worktrees; keep promoting lessons that held into
## Decisions that bind.
Sizing — lanes, not a mode¶
There is no project-wide dial. Each request is routed by its size and by what it touches (07): Quick for small, mechanical work; a Task for one behavior worth a contract; Explore when the answer is the deliverable; a Milestone for a theme. Security, data and architecture are always at least a Task.
Onboarding: enter from the build end¶
The most common onboarding mistake is starting newcomers at the most abstract work. Bring people in from the concrete end:
- Weeks 1–4 — Read the evidence. Review finished tasks: does the verdict follow from the recorded output? Would you have taken the same assumptions?
- Weeks 5–8 — Checks and residue. Improve a task's checks so they fail on a plausible wrong implementation; practise the security, concurrency and architecture read.
- Weeks 9–12 — Rules and assumptions. Write the direction for a real request; sweep the six dimensions; see what you would have left silent.
- Beyond — Domain. Decide what the project should be true about. That is the senior skill, not the entry skill.
Tool portability¶
The method is plain text that refers to files in the repository; its seal is a git commit; its evidence is your own test command's output. Nothing depends on one agent.
| Concern | Where it lives |
|---|---|
| The method | .claude/skills/add/SKILL.md (and its four references) |
| Working state | .add/PROJECT.md, the open task and milestone files |
| Seal and history | git: freeze(<slug>), refreeze(<slug>), verify(<slug>) commits |
| Evidence | each task's ## EVIDENCE |
Claude Code loads the skill natively (/add). Other agents read the managed ADD block the installer writes into AGENTS.md (and CLAUDE.md), which points them at the same skill file; if .gemini/ exists, the installer also adds AGENTS.md to Gemini CLI's context files. An agent that reads neither file can be pointed at .claude/skills/add/SKILL.md directly. Switching agents changes who reads the bundle, nothing else.
Coming from ADD 3.x¶
A 3.x bundle reads as-is; the extra files are history. See 20 · What changed in 4.0.
Adoption is a loop too. Every cycle should fold improvements back into your own specs, invariants and personas.