The flow chapters (03–08) take one feature from spec to verified. The loop chapter (09) keeps a milestone going until its goal is met. The stages chapter (10) graduates the project's rigor. None of them ship. This chapter names the act every project eventually performs and that the method, until now, never formalized: bundling closed milestones into a versioned, user-facing release whose notes are evidence-backed, whose risk is disclosed, and whose behaviour is then watched.
Releasing is the fifth scope level — after the task, the milestone, the foundation/setup level,
and stage graduation. Like every scope level it runs the same shape: gather → propose → the human
confirms → the engine records and enforces a floor. And like graduation, it ends with an outward
act the human owns. The operational recipe lives in the release.md skill guide; this chapter is the
why behind it.
16.1 · Why release is its own scope level¶
A number bump is not a release. A release is the moment one or more closed milestones become a versioned cut that real users can run. Three distinctions make it its own scope level:
- Milestone ≠ release. A milestone is feature-complete and consolidated — its goal is met and
its lessons are gathered into the foundation (see 14 · The foundation and the
fold.mdretrospective consolidation). A release is shipped and watched. The first is an internal state; the second faces outward. - Graduation ≠ release. Stage graduation moves the project's rigor (mvp → production); a release ships a version. The two axes are orthogonal: you cut a prototype preview, an mvp beta, and a production GA, each at its own stage. You release at every stage, not only at the end.
- A release bundles; it does not equal. One version may attribute several milestones — "we shipped after a couple of milestones closed" is the normal case, not the exception. Forcing one release per milestone is the anti-pattern; the decoupling is the whole point.
So release sits beside the other scope levels rather than inside any of them. The granularity ladder is now complete: intake → milestone → task, with stage graduation and release as the two cross-cutting levels that change rigor and ship versions respectively (see the Scope level entry in Appendix C).
16.2 · The cue and the inventory — gather, never judge¶
The trigger is a status line. When at least one milestone is done, archived, and not yet attributed
to any release, add.py status prints:
→ releasable: N milestone(s) closed since last release
That line is a tally, never a verdict. It counts archived-but-unreleased milestones; it is silent for a project that has never released or has already shipped everything (grandfathered — zero change). It says there is something to consider, not you are ready.
To gather the cut's evidence, run add.py release-report. It clusters five labeled record-sets: the
closed milestones since the last release · their consolidated deltas (the "what changed" record) ·
the open RISK-ACCEPTED waivers riding into the release · any open security HARD-STOP (a blocker) ·
the §2 scenarios to take live as monitors. The report gathers; it does not judge — there is no
readiness score to read off, because a tally that pretended to be a verdict would invite reading the
number instead of the evidence.
The reuse claim, stated plainly: the consolidated deltas are the changelog source. You do not write
release notes from memory. The foundation already recorded what changed when each milestone was
consolidated (fold.md); the release surfaces it. This is why release runs after consolidation, not
before. The lifecycle order is one line:
milestone-done → fold → compact → archive → (repeat ≥1×) → release → watch.
16.3 · Drafting the notes and the version — the proposal¶
From those record-sets you draft a Keep a Changelog entry: group the changes under Added / Changed / Fixed and name the headline capabilities concretely, in the user's language, not the commit's. Each bundled milestone's goal anchors one or more entries.
Then propose the version. Semver is a decision the evidence informs but does not make for you: a breaking change is a MAJOR, a new capability a MINOR, a fix-only cut a PATCH. You propose the bump; the human confirms it — the version is a judgement, not a default the tool fills in.
Both the notes and the version are shown before they are asked about. Present the drafted entry, the proposed version, and the waivers shipping in this cut via the report template — opening with the ARC (goal · done · plan) — and let the human approve once. The question is a summary to decide on; the artifact itself is rendered first, never pre-stamped.
16.4 · The floor — what the engine enforces¶
add.py release <version> is guarded. Before it records anything it enforces a readiness floor,
refusing with a non-zero exit and leaving every file byte-unchanged on any of four conditions:
release_security_open— an open securityHARD-STOPexists. This is the non-negotiable one: a security finding is never shipped. Resolve it first, as a change request back to Specify.release_tests_red— the suite is not green. A release ships on evidence, not on a plausible diff.release_no_closed_milestone— nothing new since the last release. The cut would be a no-op; do not bump a version to mark time.release_undisclosed_waiver— aRISK-ACCEPTEDwaiver rides into the release but is missing from the notes. Disclosure is the floor: a shipped risk the user cannot read about is a hidden risk.
The security stop is un-forceable. --force exists for grandfathered and brownfield first-cuts —
the same authority valve as stage --force (10 · Setup and stages) — and
it can override the other three rejects, but it can never override release_security_open. This mirrors
the verify gate exactly (08 · Verify) and the governance ceiling that no
autonomy level may lift (11 · Governance): a security HARD-STOP is the one
outcome the method refuses to auto-pass, at verify and again at the cut.
16.5 · The cut versus the ship — the engine records, the human ships¶
Only after the human confirms do you run the cut. And here is the line that keeps releasing honest: the engine records; the human ships.
add.py release <version> records the marker. It prepends the entry to CHANGELOG.md, stamps one
append-only row (newest-first, like the §Key Decisions log) into RELEASES.md — date · version ·
milestones · waivers shipped · evidence — and attributes the bundled milestones to this version, so the
cue stops firing for them. The ledger is the attribution source: a milestone is "released" because a
RELEASES.md row says so, never because a file was edited to claim it.
What the engine does not do is act outward. It never tags, publishes, or deploys. The outward
act — git tag, npm publish, the deploy pipeline — is the human's, tool-agnostic, exactly as the
method tool "never renders" in design and "never spawns" a subagent. Design-for-failure — timeouts,
retries, rollback, a tested revert path — belongs in the pipeline the human owns, not in a method tool
that has no business holding deploy credentials. The tag is the human-gated trigger; the record is the
engine's receipt that the floor was met.
A caveat worth one paragraph.
add.py releasewritesCHANGELOG.mdat the project root. That is the right default for most repositories. But a repo with a different changelog convention — for instance a nested-package layout whose rootCHANGELOG.mdis a deliberate pointer to a package's own changelog — will get release blocks prepended above its existing content rather than replacing it (the writer preserves what is there; it does not clobber). Reconcile per repo: either let the root file carry the canonical log, or point the human's publish step at the package changelog the team treats as the source of truth.
16.6 · Watch and the hotfix path — re-entering observe¶
A release is not the finish line; it is where the most reliable information finally appears. The §2 scenarios that were pass/fail cases at build time become live monitors for the released version, and error-budget burn feeds the next loop. Live-registry and deploy confirmation are post-cut evidence, gathered after the tag — not unit tests pretending to be one.
The unhappy path is first-class. A regression found in the wild re-enters at Specify as a change request, which narrows to a hotfix release — the same seven-step flow, scoped to the fix, cut as a PATCH. Releasing does not have a separate emergency mode; it has the ordinary flow at a tighter scope.
Depth follows the stage, as everywhere in the method:
- prototype / poc — a one-line preview note and a tag; no deploy ceremony. The point is feedback.
- mvp — full notes, a tag, a guarded publish; watch the headline scenarios.
- production — every step at full rigor: notes, tag, a deploy behind a rollback-tested pipeline, live scenario monitors, and error-budget watch. The hotfix path is a routine capability here, not a fire drill.
16.7 · The flow, in one arc¶
One arc, seven steps:
cue → gather → draft notes → readiness floor → human confirms → cut → watch
- cue —
add.py statusprints→ releasable: Nwhen an archived milestone is unreleased. - gather —
add.py release-reportclusters the five record-sets (gather, never judge). - draft notes — a Keep-a-Changelog entry drawn from the consolidated deltas; propose the version.
- readiness floor — the four guarded rejects; the security stop is un-forceable.
- human confirms — the notes, version, and waivers are shown, then approved once.
- cut —
add.py release <version>records the CHANGELOG block + theRELEASES.mdrow + attribution. - watch — the scenarios become monitors; a wild regression becomes a PATCH hotfix release.
The recipe for each step — flags, the report's --json shape, the exact ledger row — lives in the
release.md skill guide. This chapter is the reasoning; the guide is the procedure.
16.8 · Worked example — this method's own 1.5.0¶
The repository already runs this by hand, which is the best evidence the flow is real. The
udd-design-loop milestone closed (4/4) and consolidated into foundation-version 33. From those
deltas the human drafted the ## [1.5.0] changelog entry, bumped the three version sources in
lockstep, and a forward-pinned test_release_1_5_0.py asserted in-repo readiness: the versions agree,
the changelog lineage survives, the feature anchors are named, and the engine is untouched by the
release. The cut itself — the git tag that triggers the npm and PyPI publish — stayed human-gated,
and the live-registry confirmation was gathered after the tag as verify evidence, never as a unit
test.
That ritual is what this chapter formalizes. release-report gathers the inventory, the floor enforces
the security stop and the disclosures, add.py release records the cut, and the human still owns the
tag. The method releases itself the way it asks every project to release: gather the evidence, disclose
the risk, record the marker, and let a person make the outward call.